← OHL Works

Conductor, OPGW & Line Works

Controlled line works from preparation and rigging through installation and completion.

AI Engineering supports conductor, earthwire and OPGW activities through controlled site preparation, earthing, rigging, installation, transfer and associated quality records, working from the approved project information and methodology applicable to each scheme.

Line work depends on control at every stage of the operation.

Conductor and OPGW activities involve more than moving a line from one structure to another. Earthing, access equipment, rigging, fittings, pulling arrangements, network conditions and the approved construction sequence all need to work together before installation or transfer activities can proceed.

AI Engineering carries out these activities in accordance with the approved project information, RAMS, permits and site controls applicable to the works.

Conductor and OPGW line-work activities

A controlled sequence from preparation to de-rigging.

  1. 01

    Review & Prepare

    Review the approved project information, working methodology, access arrangements, network conditions, plant and equipment required for the activity.

  2. 02

    Earth & Make Safe

    Apply the required conductor, earthwire or drain earth arrangements in accordance with the permits and project controls applicable to the work.

  3. 03

    Rig the Work Section

    Install the required rigging ropes, running equipment and working/access equipment needed for the planned line activity.

  4. 04

    Install or Transfer

    Carry out the conductor, earthwire or OPGW installation, replacement or transfer activity defined by the project scope.

  5. 05

    Complete Fittings & Line Activities

    Complete the relevant fittings, sagging or associated line-work activities in accordance with the approved project information.

  6. 06

    De-Rig & Record

    Remove temporary rigging and drain earths as required and complete the relevant construction, QA and handover records.

Site activities coordinated around the approved line information.

01

Conductor Earthing

Application and removal of the earthing arrangements required for the planned line activity, in accordance with the applicable permits and site controls.

02

Rigging & Access Equipment

Installation and use of rigging ropes, running equipment and working/access equipment required to support controlled line-work activities.

03

Earthwire & Fittings

Removal, replacement and installation activities involving earthwire fittings and associated line components where included within the project scope.

04

OPGW Installation

Controlled installation or replacement of OPGW in accordance with the approved project information, handling requirements and construction methodology.

05

Conductor & Earthwire Transfers

Transfer of existing conductors or earthwire between structures where required as part of approved diversion or modification works.

06

Sagging & Completion Activities

Sagging-related construction activities, checks and records where these form part of the agreed line-work scope.

The line, structures and working area have to be treated as one operation.

01

Permits & Network Conditions

The activity is coordinated with the permits, outage arrangements and network conditions applicable to the planned works.

02

Earthing Arrangements

Required conductor, earthwire and drain-earth controls are established before the relevant line-work activities proceed.

03

Working at Height

Access and working equipment are established in accordance with the approved methodology and site controls.

04

Rigging & Running Equipment

The correct rigging and running equipment is positioned for the conductor, earthwire or OPGW activity being undertaken.

05

Fittings & Interfaces

Existing and new fittings are handled in the correct sequence for the approved installation, transfer or replacement activity.

06

Checks & Records

Site engineering and QA checks support hold points, construction records and handover documentation.

How does a line-work activity move from approved information to completion?

  1. Approved Project Information
  2. Permits / Network Controls
  3. Earthing & Work-Section Preparation
  4. Rigging & Access Equipment
  5. Install / Transfer / Replace
  6. Fittings / Sagging / Completion Activities
  7. De-Rig, Check & Record

Installation controlled through the same disciplined line-work sequence.

OPGW activities can require the existing earthwire arrangement, fittings, rigging, access equipment and pulling operation to be managed as one coordinated activity.

AI Engineering supports OPGW installation or replacement within the agreed construction scope, working to the approved project information, handling requirements and site methodology applicable to the scheme.

  • 01Work-section preparation
  • 02Conductor and earthwire earthing controls
  • 03Rigging and access arrangements
  • 04Existing earthwire and fitting activities
  • 05OPGW installation or replacement
  • 06De-rigging and completion records

Practical line-work delivery against approved project information.

AI Engineering coordinates the site activities required to prepare, rig, execute, check and record conductor, earthwire and OPGW works within the agreed construction scope.

  • Site and work-section preparation
  • Earthing and line-work controls
  • Rigging and access equipment
  • Conductor, earthwire and OPGW activities
  • Fitting and completion activities
  • Site engineering and QA records

Connecting erected structures into the working overhead-line system.

Once the required structures are available, conductor, earthwire and OPGW works connect those structures into the next stage of the overhead-line construction or modification sequence. These activities can also form part of diversions where existing conductors or earthwire need to be transferred onto new infrastructure.

The exact sequence depends on the network conditions, approved methodology and project scope.

Line-work records that support verification and handover.

Exact records and outputs depend on the agreed project scope, client requirements and line-work activities being undertaken.

Construction RAMS

Task-specific working arrangements and risk controls applicable to the planned line-work activity.

Inspection & Hold-Point Records

Site engineering and QA records associated with the relevant construction checks and hold points.

Installation / Transfer Records

Project-specific records associated with conductor, earthwire or OPGW installation or transfer activities where required.

Sagging Records

Sagging-related construction records where sagging activities form part of the agreed project scope.

QA Documentation

Quality documentation associated with the completed line-work activities.

Completion / As-Built Information

Relevant completion and as-built records prepared in the format required by the project.