Overhead Line Works

Overhead line construction delivered with engineering control.

AI Engineering supports overhead line projects through structure erection, conductor and OPGW works, network modifications, earthing and associated interfaces — bringing together site engineering, controlled construction and quality records from preparation through to handover.

01

Structures & Erection

Tower, wood-pole and H-pole construction

02

Conductor & OPGW

Line installation, transfer and modification works

03

Site Delivery

Earthing, interfaces, QA and controlled execution

From approved project information to controlled construction on site.

Overhead-line work brings together structures, conductors, access, outages, lifting, earthing and interfaces with existing network assets. Each stage needs to be coordinated so that the works can be delivered safely and in the correct sequence.

AI Engineering supports this process through practical site engineering and construction delivery, working from the approved design information, project requirements, RAMS and client procedures applicable to each scheme.

Overhead line construction and structure works

Practical capability across structures, line works and network interfaces.

01

Steel Tower Assembly & Erection

Assembly and controlled erection of overhead-line structures, including staged works around planned outage requirements.

02

Wood Pole & H-Pole Structures

Setting out, assembly, steelwork, crossarms, stays, erection and completion of wood-pole and H-pole structures.

03

Conductor & OPGW Works

Rigging, conductor and earthwire activities, OPGW installation, fittings and associated line-work operations in accordance with approved project information.

04

Diversions & Network Modifications

Conductor transfers, temporary arrangements and staged modifications required to move an existing circuit onto new or altered infrastructure.

05

Dismantling & Recovery Works

Controlled dismantling and recovery of redundant line components, including ADSS and associated fittings where included in the project scope.

06

Earthing & OHL Interfaces

Structure earthing, sealing end platform and cable ladder interfaces, downleads, droppers and other associated works within the agreed construction scope.

A controlled sequence from preparation to completion.

  1. 01

    Review & Plan

    Approved drawings, design information, access requirements, RAMS, programme, outage interfaces and construction controls are reviewed before work starts.

  2. 02

    Set Out & Prepare

    Structure positions and working areas are established as required, existing-service information is considered, and plant, materials and access arrangements are prepared.

  3. 03

    Assemble & Erect

    Tower or pole structures are assembled with the required steelwork, crossarms, stays and associated components before controlled erection in accordance with the project methodology.

  4. 04

    Earth & Rig

    Structural and conductor earthing, rigging ropes, working/access equipment and relevant fittings are established for the next stage of the works.

  5. 05

    Install, Transfer or Modify

    Depending on the project, this may include conductor or OPGW installation, conductor transfers, temporary spans, network diversion activities, downleads, droppers or controlled dismantling.

  6. 06

    Verify & Handover

    Construction checks, hold points, quality records and project-specific completion information are assembled to support handover.

Sequence matters when the network, structures and site all interact.

OHL construction often involves existing assets, restricted access, work at height, lifting operations and tightly controlled network interfaces. A change at one stage can affect the activities that follow.

AI Engineering's approach is to connect the approved engineering information with the practical requirements of the working site — helping the project team plan, execute, check and record the works in a controlled sequence.

Construction information that supports delivery and handover.

Exact outputs depend on the agreed project scope, client requirements and the construction activities being undertaken.

Construction Methodology

RAMS and task-specific working arrangements applicable to the agreed activities.

Setting Out / Site Records

Relevant site engineering and location records where included within the works.

Inspection & Hold-Point Records

Quality checks and recorded hold points associated with the construction sequence.

Structure / Earthing Records

Project-specific records associated with installed structures, steelwork and earthing where required.

Line-Work Records

Installation, transfer, OPGW installation or sagging records where these form part of the project scope.

Handover Information

Completion and as-built information produced in the format required by the project.